- Step 1: Roll a small basketball or rubber ball on the green
to determine the
effects
of the undulations you have installed. This will help in determining
where to install the cups depending on the desired breaks you
wish to create. Experiment by placing the cups on the base and
rolling the ball to each location until you have the desired locations
- Step 2: Using post-hole diggers, dig out the holes for the
cups in the previously determined locations. Dig far enough down
to ensure the cup will be 1/2" higher than the surface of
the base when installed. This is important because it will help
you
find the holes once the turf is laid on top of the base.
- Step 3: Wrap the entire cup twice with wax paper or mylar seam
tape and then tape the bottom of the cup with duct tape.
- Step 4: Place the cup in the center of the hole you dug and
place Kwik-Crete cement evenly around the cup all the way up to
the surface of the base. Pour water over the cement until it soaks
in. Place the pin for the hole or a 30” pole marker in the
cup to keep it level and eye the cup from all angles to ensure
it is straight.
- Step 5: Using a hard bristled push broom, broom the entire
surface of the base to ensure that there are no meter marks or
dimples present.
You are now ready to move on
to Turf Installation. |
|
|