- Step 1: Determine the size and shape of your green as well as
any chipping stations and/or sand traps.
- Step 2: Measure the length and width you determined from Step
1 on the ground and using irrigation flags or stakes and landscape
marking paint, outline the designed shape.
Check for irrigation heads and be sure they are all capped off.
- Step 3: Once the green is outlined you are ready to remove
any existing sod. If your existing ground is not sod covered,
skip
to Step 4. Utilizing a sod cutter remove the sod from the staked
green area plus an additional 1’ to 1 1/2‘ around
the perimeter. Set the depth of the sod cutter to between 2
and
3
inches.
- Step 4: You now have the green area laid out and have removed
any sod from the area plus an additional 1’ outside. Rough
grade the area using a landscape rake, then using a water hose
and nozzle, lightly wet the area and then compact using either
a 2 ton double drum roller or 19” plate compactor depending
on the size of the green and equipment availability. Make 2 passes
over the area to ensure sufficient compaction.
You are now ready to move on to Base
Installation.
|
|
|